SECURING THE GRID
AGAINST ALL HAZARDS
Severe Weather
Cyber Attack
Sabotage
Solar Storms
Electromagnetic Pulse
Dr. Peter Vincent Pry
EMP Task Force on National and Homeland Security
peterpry@verizon.net
540-894-5742
301-481-4715
EMP FIELDS
VARYING BURST HEIGHTS
PURPLE RING DENOTES
EMP FIELD AT
20 MILES (30 km) HOB
ACHIEVABLE BY
SHIP-LAUNCHED SA-2 MISSILE
OR
METEOROLOGICAL BALLOON
GRID ARCHITECTURE
EHV TRANSFORMER
BLACKOUT
1989 HYDRO-QUEBEC
GEOMAGNETIC STORM
SCADAS
PROTECTION
Blocking Devices--These prevent ground induced currents (magneto-hydrodynamic EMP or E3) caused by a geomagnetic storm or nuclear weapon from entering EHV transformers, that are indispensable to the operation of the electric grid, very difficult to replace, and must be protected.
Surge Arrestors--Can be used to prevent the powerful electromagnetic shockwave (E1) generated by a nuclear weapon or non-nuclear radiofrequency weapon from entering and damaging EHV transformers and other critical equipment.
Faraday Cages--Are enclosed metal structures, like a metal box, that prevents any type of EMP from penetrating and damaging electrical components inside the Faraday Cage. Entire buildings, like electric grid substations that have vitally important Supervisory Control And Data Acquisition Systems (SCADAS), can be designed or retrofitted to serve as a Faraday Cage, protecting SCADAS and other electronic systems within. A simple metal shed with metal roof and no windows could serve as a Faraday Cage.
Surge Arrestor-Neutral Grounding Device
DO NOT WAIT FOR WASHINGTON
CRITICAL INFRASTRUCTURE PROTECTION ACT
(CIPA)
Secure High-voltage Infrastructure for Electricity from
Lethal Damage Act
(SHIELD Act)
Grid Reliability and Infrastructure Defense Act
(GRID Act)
STATE EMP PROTECTION INTIATIVES
MAINE
VIRGINIA
ARIZONA
Florida
Oklahoma
North Carolina
Indiana
Pennsylvania
New York
Utah
GENERIC EXECUTIVE ORDER
EXECUTIVE ORDER
EXECUTIVE DEPARTMENT
STATE OF ______________________
EXECUTIVE ORDER NO.__________
by the
GOVERNOR OF THE STATE OF __________________
WHEREAS, the reliable operation of [STATE]’s electrical transmission grid system is critical to ensure the health and safety of the People of the ________________; and
WHEREAS, it is recognized that such electrical grid system within the State of ____________ is part of a regional system that is governed and administered by the ______________ (Regional Electric Reliability Organization); and
WHEREAS, it is further recognized however that such regional grid system is dangerously vulnerable to natural and nuclear electromagnetic pulse (EMP) and other man-made and natural acts that could disrupt service for a period of time that could pose significant risk to the security of the People of __________ as well as to the security of our Nation; and
WHEREAS, such vulnerability constitutes an extant energy emergency; and
WHEREAS, it is thus incumbent upon this Office to take measures through the Executive Department to protect the portion of the transmission grid system located within the State of ____________ to the greatest extent possible;
NOW THEREFORE, I______________, Governor of the State of _____________, hereby do declare that an energy emergency exists within the State of ___________________. I do hereby further declare that such energy emergency is based upon the existing vulnerability of the electrical transmission grid located within the State of __________ to natural and nuclear EMP and other man-made and natural acts that could disrupt service for a period of time that could pose significant risk to the security of People of this State.
IT IS FURTHER DECLARED AND ORDERED that no later than ___________, all investor owned and public utilities shall file a secure, confidential report to the Adjutant General and the Director of Emergency Services that shall identify grid vulnerabilities and their individual plans to address such vulnerabilities; and
IT IS FURTHER DECLARED AND ORDERED that no later than (60 days from the above date) the Adjutant General and the Director of Emergency Services shall submit a combined secure and confidential report to the Office of the Governor summarizing the above-referenced reports and plans and setting forth their specific recommendations for securing the transmission grid system located within _______________.
IT IS FINALLY DECLARED that the actions set forth in this Order are authorized by Article __, Section _______ of the Constitution of the State of ____________; and further specifically authorized by _____________________.
IN WITNESS WHEREOF I have hereunto set my
hand and caused the Great Seal of the State of ___
to be affixed this __day of ____, 2014.
_____________________________
Governor of __________________